Measures employed to prevent erosion including: soil stabilization practices, limited grading, mulch, temporary or permanent cover, compost application, and construction phasing. Erosion control is especially important in the Northland due to clay soils.

The Science of Seeds

The Science of Seeds

Remember how 10 blindfolded people in a room each describe the elephant from their own perspective? The same might be said of soil—the stuff we interchangeably refer to as ground, dirt, or surface covering. Eric C. Brevik, a professor of soil science at Dickinson State University in North Dakota, illustrates

Sediment Control Case Studies

Sediment Control Case Studies

In performing sediment control, Stacy’s ­Excavating typically uses silt fence, erosion logs, fabric mats, and inlet drain covers for its work. Among the items used are Blocksom and Co. products. The company’s Storm Water Inlet Filter serves as a sediment control solution for sewer inlets during the construction phase; it

Studies in Sediment Control

Studies in Sediment Control

When Nathan Stacy started Stacy’s ­Excavating in 2001, the Arcadia, IN-based company was bringing in less than $50,000 in revenues. The company is now pulling in more than $1 million.

Cost-Effective Erosion Control With Blankets and Mats – Part 1

Cost-Effective Erosion Control With Blankets and Mats – Part 1

For temporary slope protection or long-term channel reinforcement, erosion control blankets and turf reinforcement mats are finding new uses in diverse environments.

Today’s tough federal and state environmental laws force both public and private developers to be much more careful in developing a construction site than in the past. National Pollutant

The Seeds of Stability

The Seeds of Stability

Growth lies at the heart of erosion control. Certainly the most tangible growth in the practice of hydroseeding can be visible in the form of new plant stems rising toward the sun, but creative hydroseeding methods-combining mulches, techniques, and seed mixes for well-timed establishment-reflects development of another kind. Highway construction,

Combination Locked

Combination Locked

Getting your erosion control needs met the first time you roll out protection for your project is essential. In this economy, erosion control budgets don’t allow for a margin of error within total costs. Making your project dollars stretch further by choosing the product that can handle all that nature

Products of Their Environment

Products of Their Environment

A couple of time-proven products used in erosion control are somewhat temporary erosion control blankets (ECBs) and longer-lasting turf reinforcing mats (TRMs)-collectively known as “rolled erosion control products” (RECPs). ECBs are used to help establish the growth of vegetation-the best material for erosion control-before degrading, while TRMs supplement vegetation on

Challenges in Slope Stabilization

Challenges in Slope Stabilization

Keeping soil in place is hard enough on flat land. Engineers, contractors, and others who work with slopes have gravity to contend with as well as soil type and water. And then there is whatever’s under the soil. The Millennium Pipeline project in New York restored environmentally sensitive agricultural land

What You Need for Seed

What You Need for Seed

It probably goes without saying: If the site was perfect, it likely wouldn’t need erosion control. Good soil, good drainage, a gentle slope or none, plenty of vegetation-in real life, that’s the “after” photo. No wonder your work is so challenging! It’s often difficult enough to get control measures in

Managing Runoff From Start to Finish

Managing Runoff From Start to Finish

The Phase II regulations of the National Pollutant Discharge Elimination System (NPDES) require permittees to address six minimum stormwater runoff control measures. Two of them apply directly to stormwater design and construction on development projects. First, temporary erosion control best management practices (BMPs) must be implemented to keep runoff and